Construction Cost |
|
Inspection Fee |
|
|
($275/day - 1 day minimum) |
|
| Underground (1 yr. minimum) |
|
|
|
|
|
|
|
|
|
|
Sanitary Sewer (# total footage) |
$ |
|
|
|
days |
$ |
|
|
|
|
Storm Sewer (# total footage) |
$ |
|
|
|
days |
$ |
|
|
|
|
Waterline (# total footage) |
$ |
|
|
|
days |
$ |
|
|
|
|
Rough Grading & Detention Ponds |
$ |
|
|
(include with storm sewer) |
|
|
|
TOTAL UNDERGROUND |
$ |
|
|
|
days |
$ |
|
|
|
|
|
|
|
|
| Above
Ground (1 yr. minimum) |
|
|
|
Curb & Gutter, Underdrain, |
|
|
Subgrade, Agg Base, Asphalt Base |
|
|
(# centerline footage) |
$ |
|
|
|
days |
$ |
|
|
|
|
Curb Ramps/Walks, Finish Grade, |
|
|
Seed & Mulch |
$ |
|
|
(include with curb & gutter) |
|
|
|
TOTAL ABOVE GROUND |
$ |
|
|
|
days |
$ |
|
|
|
|
|
|
|
|
| Asphalt
(2 yr. minimum) |
|
|
|
Asphalt Surface Course (#
centerline footage) |
|
|
|
|
|
TOTAL ASPHALT |
$ |
|
|
|
days |
$ |
|
|
|
|
GRAND TOTAL INSPECTION FEE |
|
$ |
|
|
|
|
|
|
|
Construction costs are based on |
|
actual bid amount. |
|
|
|
|
|
P.E. Signature |
|
|
|
|
|
|
|
|
|
| Three
bonds and inspection fees are required for each subdivision, to be filed
simultaneously prior to beginning |
| construction. Bonds will be released upon acceptance of
the improvements by the Chief Engineer. |
|
|
|
|
|
|
|
|
|
|
|